Henan Tytion Machinery Co., Ltd.

Serve Every Client Patiently

Manufacturer from China
Active Member
4 Years
Home / Products / Cement Grout Pump /

Compact Structure Large Output PU Grouting Machine Convenient Operation

Contact Now
Henan Tytion Machinery Co., Ltd.
City:zhengzhou
Province/State:henan
Country/Region:china
Contact Person:MsJenny
Contact Now

Compact Structure Large Output PU Grouting Machine Convenient Operation

Ask Latest Price
Video Channel
Brand Name :Tytion
Model Number :BW250
Certification :CE, ISO, SGS
Place of Origin :China
MOQ :1 set
Price :Negotiable
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :120 sets per month
Delivery Time :3-5 working days
Packaging Details :Wooden case package
name :PU Grouting Machine
Motor power :15 KW
Pressure :six MPA
Plot ratio :ninety percent
intake pipe dia.(mm) :64
discharge pipe dia.(mm) :32
cylinder number :3
material :carbon steel
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

PU Grouting Machine

Structure of PU Grouting Machine:

PU Grouting Machine(BW-250 type)is mainly composed of pump head, pump body, frame, protective cover, clutch, water filter, air chamber and pressure gauge. The pump body, pump head, frame and other parts are bolted to facilitate the decomposition of difficult transportation and removal.

Technical parameters of PU Grouting Machine:

Cylinder number 3
Bore diameter 80mm
Piston stroke 100mm
Diameter of suction pipe 64mm
Diameter of outlet pipe 32mm
Motor power 15kw
Main shaft speed 1450 r/min
Working pressure 6 Mpa

Structure of PU Grouting Machine:

PU Grouting Machine is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.
Preparations before pumping:
After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

Compact Structure Large Output PU Grouting Machine Convenient Operation

Inquiry Cart 0