Continuous working Electric driven Concrete Mixer Pump adjustable speed
Concrete Mixer Pump
Lubrication of Concrete Mixer Pump:
1. Lubrication prolongs the service life of equipment and minimizes the wear of moving parts. For this purpose, all gears and bearings and moving parts must be well lubricated and other impurities must be prevented from entering the oil.
2. Each class should be based on working hours and workload, periodically check valve pipe pendulum big S, small diameter of axle and rotational lubrication situation of gear, rack, every once in a while manual lubricating oil pump handle several times, through the oil, and lubricating oil way to S tube valve is placed inside the oil seal of filling oil, reduce wear and prolong service life. The hydraulic oil in the tank is replaced every 6 months on time with a new, sufficient and consistent hydraulic oil. At the same time, pay attention to the sealing of the hydraulic oil pipe connection and lubricating oil road to prevent oil leakage, which will not only pollute the pump body, but also cause damage to the equipment due to poor lubrication!!
3. The tank should be filled with "000" grease or cutting fluid (solid cutting agent to water ratio of 1:50).
Parameter of Concrete Mixer Pump:
Model | GS120-1 | GS120-2 |
Number of cylinder | 2 | 2 |
Material cylinder diameter | 120mm | 120mm |
Air cooler model | AH1012T-CA (AC380) | AH1012T-CA (AC380) |
Type of Gear Pump | GJ2050/L | GJ2050/L |
Rated pressure of gear pump | 20 MPa | 20 MPa |
Maximum outlet pressure | 3 MPa | 3 MPa |
Theoretical discharge | 7-9 m³/h | 7-9 m³/h |
Pump lift | 20m | 30m |
Distance of farthest conveying | 40m | 60m |
Maximum material diameter | 20mm | 20mm |
Tank volume | 78 Liter | 78 Liter |
Dimension size | 1895×726×1300 mm | 1895×726×1300 mm |
Weight | 700kg | 730kg |
Working process of Concrete Mixer Pump:
First of all, the concrete pump must be parked on flat, solid ground, absolutely not on soft ground, in order to avoid the inclination in the process of work.
Start the main motor for a short time operation, and observe whether the pressure gauge is normal. According to the length of the pipeline, before starting the construction work, we must first pump the water into the pipeline through the pendulum valve to lubricate the pipe wall. Then mortar, and finally concrete, work begins, and often run the test pump empty, with clear water pumping to confirm the smooth pipeline.
Pictures of Concrete Mixer Pump: