Henan Tytion Machinery Co., Ltd.

Serve Every Client Patiently

Manufacturer from China
Active Member
4 Years
Home / Products / Cement Grout Pump /

Slurry Injection Variable Pressure Hand Grout Pump Large Output for Subway

Contact Now
Henan Tytion Machinery Co., Ltd.
City:zhengzhou
Province/State:henan
Country/Region:china
Contact Person:MsJenny
Contact Now

Slurry Injection Variable Pressure Hand Grout Pump Large Output for Subway

Ask Latest Price
Video Channel
Brand Name :Tytion
Model Number :BW150
Certification :CE, ISO, SGS
Place of Origin :China
MOQ :1 set
Price :Negotiable
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :120 sets per month
Delivery Time :3-5 working days
Packaging Details :Wooden case package
name :Hand Grout Pump
Material :Carbon Steel
Motor :7500 w
Pressure :7 mpa
Input speed :1450 r/min
suction pipe dia. :50 mm
Drainage pipe dia. :32 mm
cylinder number :three
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Hand Grout Pump

Description of Hand Grout Pump:

BW150 grouting pump is a horizontal three-cylinder reciprocating single-acting piston pump, which is mainly used in road, bridge, dam, mine and high-rise building grouting construction. Eight different working pressures and flow rates can be changed.

Technical parameters of Hand Grout Pump:

Cylinder number 3
Bore diameter 70mm
Piston stroke 70mm
Suction height 2.5 meter
Diameter of suction pipe 50mm
Diameter of outlet pipe 32mm
Motor power 7.5kw
Main shaft speed 1450 r/min
Working pressure 7 Mpa

Structure of Hand Grout Pump:

Hand grout pump is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.
Preparations before pumping:
After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

Slurry Injection Variable Pressure Hand Grout Pump Large Output for Subway

Inquiry Cart 0