Henan Tytion Machinery Co., Ltd.

Serve Every Client Patiently

Manufacturer from China
Active Member
4 Years
Home / Products / Cement Grout Pump /

CE SGS 7.5KW Hand Cement Grout Pump Construction Low Pressure

Contact Now
Henan Tytion Machinery Co., Ltd.
City:zhengzhou
Province/State:henan
Country/Region:china
Contact Person:MsJenny
Contact Now

CE SGS 7.5KW Hand Cement Grout Pump Construction Low Pressure

Ask Latest Price
Video Channel
Brand Name :Tytion
Model Number :BW150
Certification :CE, ISO, SGS
Place of Origin :China
MOQ :1 set
Price :Negotiable
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :120 sets per month
Delivery Time :3-5 working days
Packaging Details :Wooden case package
name :Hand Cement Grouting Pump
Electric motor power :7.5 KW
Engine driven :electric, diesel
Dia. of inlet pipe :50 mm
Dia. of outlet pipe :32 mm
Machine model :BW150
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Easy to use low pressure Hand Cement Grouting Pump construction equipment

Hand Cement Grouting Pump

Transmission of Hand Cement Grouting Pump:
Transmission for four gears (gear can be found in the "handle" on the whole machine nameplate), there were four pair of change gear and a pair of meshing bevel gear, often by a gearbox transmission rod centralized control, when the gear lever, a shift will drive the guide bar at the bottom of the handle linear movement, so that the fork drives the sliding gear, respectively, on the guide bar with positioning groove, By the spring against the steel ball in the positioning groove positioning.

Technical parameters of Hand Cement Grouting Pump:

Cylinder number 3
Bore diameter 70mm
Piston stroke 70mm
Diameter of suction pipe 50mm
Diameter of outlet pipe 32mm
Motor power 7.5kw
Main shaft speed 1450 r/min
Working pressure 7 Mpa

Structure of Hand Cement Grouting Pump:

Hand cement grouting pump is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.

Preparations before pumping of Hand Cement Grouting Pump:


After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

Pictures of Hand Cement Grouting Pump:

CE SGS 7.5KW Hand Cement Grout Pump Construction Low Pressure

CE SGS 7.5KW Hand Cement Grout Pump Construction Low Pressure

CE SGS 7.5KW Hand Cement Grout Pump Construction Low Pressure

CE SGS 7.5KW Hand Cement Grout Pump Construction Low Pressure

Inquiry Cart 0