
Add to Cart
swimming pool equipment 5/6/7 m³/h Gunite Concrete Machine continuous
Gunite Concrete Machine
Start Spraying Operation of Gunite Concrete Machine:
After the preparation work is completed, the mixing material can be added into the machine. At this time, the machine operator should first open the main valve, fully open the valve of the upper air pipe, and then adjust the lower air pipe (pressure to the cyclone) to about 0.05-0.1mpa no-load air pressure (depending on the conveying distance). The jetter then opens the nozzle valve to prewet the surface of the rock mass. At this time, the machine operator can start the machine and begin to spray concrete. The current working pressure is about 0.2-0.4mpa. According to the water-cement ratio of mixing material and the conveying distance, adjust the air pressure to the cyclone until the jet operator considers the jet velocity appropriate (injection distance 0.6-1m). After the lower pipe valve is adjusted, open the upper pipe valve again until there is no more material leaking out of the residual air port of the machine.
Parameters of Gunite Concrete Machine:
Technical | Parameters | ||||
Model | PZ-5 | PZ-6 | PZ-6F | PZ-7 | PZ-9/WSP |
Throughput(m3/h) | 5-5.5 | 6 | 6-7 | 7 | 9 |
Transport Distance (Tidal Spray) (m) | 200 | 200 | 200 | 200 | 200 |
Applicable Material (Cement/Sandstone) Ratio | 1:3~5 | 1:3~5 | 1:3~5 | 1:3~5 | 1:3~5 |
Applicable Material (Water/Ash) Ratio | ≤0.4~0.45 | ≤0.4~0.45 | ≤0.4~0.45 | ≤0.4~0.45 | ≤0.4~0.45 |
Aggregate size (mm) | φ20 | φ20 | φ20 | φ20 | φ20 |
Working Pressure (MPa) | 0.2~0.4 | 0.2~0.4 | 0.6~0.8 | 0.6~0.8 | 0.6~0.8 |
Feeding height (m) | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 |
Rotor speed (r/min) | 11 | 11 | 11 | 11 | 11 |
Motor Power (KW) | 5.5 | 5.5 | 7.5 | 7.5 | 7.5 |
Motor speed (r/min) | 960 | 960 | 960 | 960 | 960 |
Operation Method of Gunite Concrete Machine:
After the preparation work is finished, the mixing material can be added to the machine. The machine operator should first open the main valve, the valve of the upper air duct opens 1/3 circles, and then adjust the air pressure of the lower air duct (to the cyclone) to about 0.05-0.1 MPa (depending on the delivery distance). Then the sprayer opens the nozzle valve and gives the wet rock surface. At this time, the operator can start the machine and start shotcreting. Now the working pressure is about 0.2-0.4 MPa. According to the water-cement ratio of mixtures and the length of conveying distance, after adjusting and determining the wind pressure to the cyclone, the upper air pipe valve is opened again until there is no more material leakage at the machine outlet.
Pictures of Gunite Concrete Machine:
Construction Site and Warehouse of Gunite Concrete Machine: